Representative:
Thank you
for your continuing service to all Kentuckians.
I hope
you find our analysis and suggestions constructive as your Committee continues
to perfect this legislation.
More
background: http://ncad.net Click:
News then ?Power
I will
endeavor to also notify other members of the Committee
and look
forward to providing testimony Monday.
Respectfully,
john r.
schmidt, M.S.
President,
NCAD Corporation
859
727-9999
2002 03
22
Recent
History of SB-257 of Senator
Ernie Harris
Mar 14
Discussed in Senate Committee on Agriculture & Natural Resources
Unanimous approval by Committee of
Committee Substitute,
subject
to Floor Amendments.
Mar 18
Passed Senate by 36-0.
Mar 20 Assigned to House Committee on Local
Government.
Mar 25 2:30pm Capitol Annex Room 113
Special
Meeting of Local Government Committee on SB-257
(& unrelated SB-184 on Fireman's
Retirement Fund)
Analysis
of Current Revision SB-257
General
Discussion
More
later, augmenting instructions and some comments within the Spot Edits.
Spot
Edits
1. Replace
"9" with {17} "...of this Act,..."
1.2 "Qualifying cogeneration
facility" is excluded.
1.5 Replace "69,000V" with {1,000V}.
1.6 Insert after: "Qualifying
cogeneration facility"
{, in which input energy rating does
not exceed 100,000,000 BTUs,}
since otherwise not defined with
maximum magnitude:
USC-16.796-18
(B)
''qualifying cogeneration
facility'' means a cogeneration facility which -
(i)
the Commission determines, by
rule, meets such requirements (including requirements respecting minimum size,
fuel use, and fuel efficiency) as the Commission may, by rule, prescribe; and
(ii)
is owned by a person not
primarily engaged in the generation or sale of electric power (other than
electric power solely from cogeneration facilities or small power production
1.7 {1.7 "Area
of Impact" is the area determined by the Board, subject to revision based
on available information,
within which a citizen may be affected, subject to wind conditions, by the operation of the proposed
facility.}
2.1.d. Delete. ?Who would volunteer for 2 years of uncompensated service,
traveling all over the state? This person would be vulnerable to
bribery.
2.1.e Since there is (at best trivial) state
purpose fulfilled by installation of Merchant Facility
but large, local impact, there must
be more assured local representation, specifically:
From the civil
entities within the Area of Impact, 3 Board members selected as follows:
1. By the Governor
2. By the highest ranking local official(s)
3. From a group comprising those working or
living within the Area of Impact, selection arbitrated by highest ranking local official.
2.2 Replace "9" with
{17} of this Act."
2.4 Comment: Chairman, with majority (4) Board Members,
comprising a quorum based in Frankfort,
does not facilitate Local
representation.
3.1 More general (protective):
No person shall commence to
construct a { combustion operation exceeding 100,000,000 BTUs}...
3.2 Replacement: More general
(protective):
"(2000) feet from any
residential neighborhood" { or facility providing services to the public
including: residential, assisted care, educational, and the like}.
4.2.L The requirement of a Site Assessment
Report (SAR) may be waived / satisfied by the alternative NEPA documentation of
compliance. A
more specific reference is required!!!!
4.4 second
line: Delete "expansion".
5.2 Delete this
subsection which invites favoritism and bribery.
Since the Board
has final say, implicitly it is clear
the applicant
will seek an acceptable basis of the SAR.
6.1.e Delete: "that existed on the date the
application was filed"
Zoning control
is the only tool available for local control.
It is
unreasonable to remove that tool prior to its need
in response to
unexpected, aggressive neighbor.
6.1.i Insert
following: "capacity to
construct and operate the proposed facility"
{and is accepted
by local committee which shall have the power of veto in circumstances of community rejection, based petitions
filed to the Board}
6.3 Insert new
subsection:
(c)
the acquirer has been approved by local committee approved by the Board.
7.1 midparagraph 2
replacements:
"...interested
persons that reside within {the Area of Impact} to consider...".
"or county
fiscal court of a jurisdiction {some part of which is within the Area of
Impact.}
8.2.b.3 Insert / replace following:
"Existing property lines and
the names of persons who own the property"
{within a 200' buffer of the
proposed horizontal alignment of the proposed transmission line}
8.2.f Insert:
"...obtain public involvement
{and notify property owners within said buffer} shall include..."
10.1.b Replace "processing":
"defray the cost of {producing} the cumulative
assessment report."
10.1.b Once again, this
reference must be more specific!
10.2.e Insert:
{ (e) For oxygen withdrawal;
1. Identification of the of dry weight of
anticipated oxygen withdrawal as a part of the proposed combustion process,
2.
Statement of the minimum level of
oxygen which will be maintained at the property boundary of the
proposed facility.
}
15.6 Replace "1972" with {2000}.
15.7 Insert:
"...to another electric supplier {or wholesaler,
or broker} for resale"
15.14 Replace twice: